{
  "status": "completed",
  "applicable_count": 1,
  "completed_count": 1,
  "failed_count": 0,
  "schema_version": 2,
  "config_hash": "b721e41033bb6bac",
  "data": {
    "floor_plans": {
      "fp_l01_mine_tunnel": {
        "status": "ok",
        "t2i_prompt": "Create a square 1024×1024 flat top-down schematic architectural floor plan of a narrow modern industrial mine tunnel. Use clean, single-weight black CAD-style outlines on a white or off-white background, geometric plan symbols only, and no people. Orient the elongated tunnel west to east. Divide it into four clearly bounded, consistently color-coded areas: number 1, the main shared tunnel passage in solid pale yellow; number 2, the eastern mineral inspection zone in solid pale gray; number 3, the western blast-door threshold in solid pale beige; and number 4, the central-eastern collapse-prone service zone in solid pale cyan. Show number 5 as paired narrow-gauge rail lines running east-west through the passage and stopping before the mineral face. Show number 6 as a repeated row of simple transverse mine-support frames, represented by plan-view posts and cross-frame lines, with one numbered marker for the complete support row. Show number 7 as a heavy transverse blast door at the western threshold, using a thick straight sliding-door plan symbol recessed into reinforced side pockets. Show number 8 as a persistent irregular black mineral vein embedded across part of the eastern end wall, represented by a solid geometric black band. Show number 9 beside a grouped bank of three fixed wall sensors on the north wall near the inspection zone. Show number 10 beside a regular centerline row of fixed ceiling-light symbols. Show number 11 beside a narrow fixed drainage channel along the south wall. The layout should reflect a 2020s industrial retrofit within an older Pennsylvania-region mine: a tight working passage, narrow-gauge rails, regularly spaced structural supports, a reinforced emergency seal, practical wall sensors, and utilitarian fixed lighting. Draw each base marker from 1 through 11 exactly once as a small white circle with a black integer. Do not draw markers 12 through 21 because they are transient state-overlay cues. Permit only the generic area labels Shared Zone, Inspection Zone, Threshold Zone, and Service Zone inside their colored areas, plus a small north arrow with N in one corner; include no other text, legends, dimensions, annotations, camera icons, field-of-view cones, or arrows. Strictly no 3D, isometric, perspective, axonometric, depth, shadow, shading, gradients, blending, ambient occlusion, photorealism, rendered lighting, lighting effects, textured surfaces, or material rendering. Use flat solid pastel fills only, with no drop shadows.",
        "key_elements": [
          "Elongated west-to-east mine tunnel divided into four flat pastel zones",
          "Paired narrow-gauge rails through the main passage",
          "Repeated structural support frames across the tunnel",
          "Heavy sliding blast door at the western threshold",
          "Black glasslike mineral vein at the eastern end wall",
          "Grouped bank of three fixed wall sensors near the mineral face",
          "Fixed centerline ceiling-light row",
          "Fixed drainage channel along the south wall",
          "Central-eastern collapse-prone section reserved for state overlays",
          "Transient collapse, dust, water, weathering, roots, and device cues excluded from the base diagram"
        ],
        "numbered_elements": [
          {
            "number": 1,
            "label": "main tunnel passage",
            "category": "area",
            "position_hint": "central elongated west-to-east shared passage",
            "base_layer_decision": "base_structural_unit"
          },
          {
            "number": 2,
            "label": "mineral inspection zone",
            "category": "area",
            "position_hint": "east end of the tunnel against the mineral face",
            "base_layer_decision": "base_structural_unit"
          },
          {
            "number": 3,
            "label": "blast-door threshold",
            "category": "area",
            "position_hint": "west end of the tunnel around the emergency seal",
            "base_layer_decision": "base_structural_unit"
          },
          {
            "number": 4,
            "label": "collapse-prone service zone",
            "category": "area",
            "position_hint": "central-east tunnel section between the main passage and inspection zone",
            "base_layer_decision": "base_structural_unit"
          },
          {
            "number": 5,
            "label": "narrow-gauge rails",
            "category": "prop",
            "position_hint": "paired lines along the tunnel center from the west threshold toward the east end",
            "base_layer_decision": "base_persistent_fixture"
          },
          {
            "number": 6,
            "label": "support frame row",
            "category": "prop",
            "position_hint": "regular transverse frames spanning the tunnel from west to east",
            "base_layer_decision": "base_persistent_fixture"
          },
          {
            "number": 7,
            "label": "sliding blast door",
            "category": "opening",
            "position_hint": "across the west threshold with recessed side pockets",
            "base_layer_decision": "base_opening"
          },
          {
            "number": 8,
            "label": "black mineral vein",
            "category": "prop",
            "position_hint": "embedded in the east end wall of the inspection zone",
            "base_layer_decision": "base_persistent_fixture"
          },
          {
            "number": 9,
            "label": "three-sensor wall bank",
            "category": "prop",
            "position_hint": "north wall near the east mineral inspection zone",
            "base_layer_decision": "base_persistent_fixture"
          },
          {
            "number": 10,
            "label": "ceiling light row",
            "category": "prop",
            "position_hint": "along the tunnel centerline between the blast door and mineral face",
            "base_layer_decision": "base_persistent_fixture"
          },
          {
            "number": 11,
            "label": "drainage channel",
            "category": "prop",
            "position_hint": "continuous narrow channel along the south wall",
            "base_layer_decision": "base_persistent_fixture"
          },
          {
            "number": 12,
            "label": "collapsed ceiling and rock pile",
            "category": "prop",
            "position_hint": "central-east collapse-prone service zone, partly obstructing the rails",
            "base_layer_decision": "state_overlay_plot_cue"
          },
          {
            "number": 13,
            "label": "active collapse dust cloud",
            "category": "prop",
            "position_hint": "around the central-east rock fall and support frames",
            "base_layer_decision": "state_overlay_plot_cue"
          },
          {
            "number": 14,
            "label": "fallen inspection drone",
            "category": "prop",
            "position_hint": "on the floor beside the rails in the collapse zone",
            "base_layer_decision": "state_overlay_transient_object"
          },
          {
            "number": 15,
            "label": "floor-hugging metallic gas",
            "category": "prop",
            "position_hint": "flowing low through the collapse zone toward the mineral face",
            "base_layer_decision": "state_overlay_plot_cue"
          },
          {
            "number": 16,
            "label": "suspended frozen dust",
            "category": "prop",
            "position_hint": "motionless in the air throughout the collapse zone",
            "base_layer_decision": "state_overlay_plot_cue"
          },
          {
            "number": 17,
            "label": "stopped water droplet",
            "category": "prop",
            "position_hint": "near a crack and the south drainage channel in the collapse zone",
            "base_layer_decision": "state_overlay_plot_cue"
          },
          {
            "number": 18,
            "label": "blast-door rust weathering",
            "category": "prop",
            "position_hint": "spreading across the surface and seams of the west blast door",
            "base_layer_decision": "state_overlay_plot_cue"
          },
          {
            "number": 19,
            "label": "expanding tree roots",
            "category": "prop",
            "position_hint": "forcing through the blast-door seams and adjacent concrete",
            "base_layer_decision": "state_overlay_plot_cue"
          },
          {
            "number": 20,
            "label": "root-driven concrete cracks",
            "category": "prop",
            "position_hint": "around the western threshold and extending into nearby tunnel lining",
            "base_layer_decision": "state_overlay_plot_cue"
          },
          {
            "number": 21,
            "label": "stopped smartphone clock",
            "category": "prop",
            "position_hint": "with the trapped worker near the rock pile in the collapse zone",
            "base_layer_decision": "state_overlay_transient_object"
          }
        ],
        "camera_recommendations": [
          {
            "bg_id": "L01B03",
            "sub_location": "mine_tunnel_interior",
            "camera_position": "near number 7 (sliding blast door), facing east along number 5 (narrow-gauge rails) toward number 8 (black mineral vein), with number 9 (sensor bank) on the north wall",
            "camera_height": "eye-level standing ~1.6m",
            "lens_hint": "28mm wide angle",
            "framing_notes": "Emphasize the intact tunnel depth, repeated number 6 support frames, and the mineral face; keep the blast door visible behind or at a frame edge.",
            "use_numbered_elements": [
              1,
              2,
              3,
              4,
              5,
              6,
              7,
              8,
              9,
              10,
              11
            ],
            "ignore_numbered_elements": [
              12,
              13,
              14,
              15,
              16,
              17,
              18,
              19,
              20,
              21
            ]
          },
          {
            "bg_id": "L01B02",
            "sub_location": "mine_tunnel_interior",
            "camera_position": "near number 8 (black mineral vein), facing diagonally west across number 4 (collapse-prone service zone) toward number 7 (sliding blast door)",
            "camera_height": "eye-level standing ~1.6m",
            "lens_hint": "24mm wide angle",
            "framing_notes": "Include the descending or sealed blast door in the distance and make numbers 12 and 13 dominate the middle ground; place number 14 beside the obstructed rails and number 15 low along the floor.",
            "use_numbered_elements": [
              1,
              2,
              3,
              4,
              5,
              6,
              7,
              8,
              9,
              10,
              11,
              12,
              13,
              14,
              15
            ],
            "ignore_numbered_elements": [
              16,
              17,
              18,
              19,
              20,
              21
            ]
          },
          {
            "bg_id": "L01B01",
            "sub_location": "mine_tunnel_interior",
            "camera_position": "near number 2 (mineral inspection zone), facing west across number 12 (collapsed ceiling and rock pile) toward number 7 (sliding blast door) and number 19 (expanding roots)",
            "camera_height": "eye-level standing ~1.6m",
            "lens_hint": "28mm wide angle",
            "framing_notes": "Maintain a stable match-cut composition with the rock pile in the foreground or middle ground, suspended number 16 dust around the trapped position, and the weathered blast-door threshold with numbers 18 through 20 clearly readable in the distance.",
            "use_numbered_elements": [
              1,
              2,
              3,
              4,
              5,
              6,
              7,
              8,
              9,
              10,
              11,
              12,
              14,
              16,
              17,
              18,
              19,
              20,
              21
            ],
            "ignore_numbered_elements": [
              13,
              15
            ]
          }
        ],
        "scale_guideline": "This is a single subsurface tunnel level rather than a multistorey building; a clear height of roughly 2.2–3.0 m is typical for this kind of narrow industrial working passage, though the text gives no measurement. Its footprint should read as a long, confined corridor several times longer than it is wide, with a typical working width of roughly 2.5–4.0 m and no exact length specified. One full-height transverse blast-door opening is established, while the support frames and door extend from floor level to the tunnel crown; no stairs or other multilevel vertical circulation are indicated.",
        "applied_shots": [
          "S1_Shot8",
          "S1_Shot9",
          "S2_Shot12",
          "S2_Shot21",
          "S2_Shot22",
          "S3_Shot26",
          "S3_Shot30",
          "S3_Shot31"
        ],
        "group_id": "bg_mine_complex",
        "depends_on_fp": []
      },
      "fp_l02_reclaimed_tunnel": {
        "status": "ok",
        "t2i_prompt": "Create a square 1024x1024 flat top-down schematic floor plan diagram of a narrow modern industrial mine-access tunnel in a reclaimed future ruin. Use a clean architectural CAD-plan appearance with single-weight black outlines on a white or off-white background, geometric shapes only, and no decorative illustration. Show a linear west-to-east layout: an exterior approach at the far west, a short egress threshold, a reinforced blast-door frame, a narrow poured-concrete main tunnel, and a small work-face zone terminating at a dark geological vein on the east end. Use consistent single flat pastel solid fills: Main Tunnel in pale yellow, Work Zone in pale cyan, Threshold Zone in pale beige, and Exterior Zone in pale gray. Depict the blast door with a simple top-down heavy-door plan glyph, the outer mine portal as a wall opening, three wall-mounted sensor boxes as small plan symbols, and a row of fixed ceiling-light positions as simple rectangles. Use small circles containing unique black numbers exactly once for base elements 1 through 9 only: 1 Main Tunnel, 2 Work Zone, 3 Threshold Zone, 4 Exterior Zone, 5 blast door, 6 outer mine portal, 7 wall sensor bank, 8 fixed tunnel lights, and 9 geological vein. Short generic area labels may appear inside the colored zones, but include no other text or annotations; a small north arrow is allowed. Do not show people, equipment carried by people, cameras, view cones, giant roots, cracked concrete, torn metal, corrosion, rubble, or other event-state damage on this base diagram. Strictly no 3D, isometric, perspective, axonometric, depth, shadow, shading, gradient, blending, ambient occlusion, photorealism, rendering, lighting effects, textured surfaces, material rendering, or drop shadows.",
        "key_elements": [
          "Linear reinforced mine-access tunnel",
          "West-side exterior escape route",
          "Short threshold vestibule",
          "Heavy industrial blast door",
          "Outer daylight mine portal",
          "East work-face zone",
          "Fixed wall sensor bank",
          "Fixed tunnel light row",
          "Geological vein at tunnel end",
          "Flat pastel zone coding",
          "Base markers only; ruin-state damage reserved for overlays"
        ],
        "numbered_elements": [
          {
            "number": 1,
            "label": "main tunnel",
            "category": "area",
            "position_hint": "central linear passage between the threshold and east work face",
            "base_layer_decision": "base_structural_unit"
          },
          {
            "number": 2,
            "label": "work-face zone",
            "category": "area",
            "position_hint": "east end of the main tunnel",
            "base_layer_decision": "base_structural_unit"
          },
          {
            "number": 3,
            "label": "egress threshold",
            "category": "area",
            "position_hint": "west end between the main tunnel and exterior approach",
            "base_layer_decision": "base_structural_unit"
          },
          {
            "number": 4,
            "label": "exterior approach",
            "category": "area",
            "position_hint": "far west beyond the outer mine portal",
            "base_layer_decision": "base_structural_unit"
          },
          {
            "number": 5,
            "label": "blast door",
            "category": "opening",
            "position_hint": "west side of the threshold, spanning the reinforced tunnel frame",
            "base_layer_decision": "base_opening"
          },
          {
            "number": 6,
            "label": "outer mine portal",
            "category": "opening",
            "position_hint": "far west end of the threshold, opening toward the exterior approach",
            "base_layer_decision": "base_opening"
          },
          {
            "number": 7,
            "label": "wall sensor bank",
            "category": "prop",
            "position_hint": "distributed along both walls of the main tunnel, represented by one grouped marker",
            "base_layer_decision": "base_persistent_fixture"
          },
          {
            "number": 8,
            "label": "fixed tunnel lights",
            "category": "prop",
            "position_hint": "linear row along the main tunnel centerline, represented by one grouped marker",
            "base_layer_decision": "base_persistent_fixture"
          },
          {
            "number": 9,
            "label": "geological vein",
            "category": "prop",
            "position_hint": "embedded in the east work face at the tunnel terminus",
            "base_layer_decision": "base_persistent_fixture"
          },
          {
            "number": 10,
            "label": "giant root invasion",
            "category": "prop",
            "position_hint": "crossing the west threshold, blast door, and exit route",
            "base_layer_decision": "state_overlay_plot_cue"
          },
          {
            "number": 11,
            "label": "split concrete",
            "category": "prop",
            "position_hint": "reinforced concrete around the blast-door frame and west tunnel walls",
            "base_layer_decision": "state_overlay_plot_cue"
          },
          {
            "number": 12,
            "label": "torn blast-door metal",
            "category": "prop",
            "position_hint": "damaged leaf and frame of the west blast door",
            "base_layer_decision": "state_overlay_plot_cue"
          },
          {
            "number": 13,
            "label": "advanced door corrosion",
            "category": "prop",
            "position_hint": "across the exposed surfaces of the west blast door",
            "base_layer_decision": "state_overlay_plot_cue"
          }
        ],
        "camera_recommendations": [
          {
            "bg_id": "L02B01",
            "sub_location": "reclaimed_mine_tunnel",
            "camera_position": "near number 1 (main tunnel), facing west toward number 5 (blast door), number 6 (outer mine portal), and the daylight beyond number 4 (exterior approach)",
            "camera_height": "low eye-level standing or crouched, approximately 1.3-1.6m",
            "lens_hint": "28mm wide angle",
            "framing_notes": "Keep the damaged threshold centered; show number 10 engulfing the route through number 5, number 11 splitting the surrounding concrete, number 12 deforming the door, and number 13 aging its exposed metal. Preserve a readable crawlable route toward number 6 and daylight.",
            "use_numbered_elements": [
              1,
              3,
              4,
              5,
              6,
              7,
              8,
              10,
              11,
              12,
              13
            ],
            "ignore_numbered_elements": []
          }
        ],
        "scale_guideline": "This is a single subterranean tunnel level with no above-ground storeys; its clear height is not specified, so use a typical modern industrial mine-access height of roughly 2.5-4 meters. The passage is explicitly narrow and should read as only a few meters wide, while its depicted run may extend tens of meters, typical for this facility type rather than an exact textual measurement. The west route contains one heavy blast-door opening and one outer daylight portal. The giant roots penetrate the door plane and surrounding concrete, with at least one root described as approximately human-waist thickness; their complete vertical extent is unspecified.",
        "applied_shots": [
          "S4_Shot32",
          "S4_Shot33",
          "S4_Shot36"
        ],
        "group_id": "bg_mine_complex",
        "depends_on_fp": []
      }
    },
    "consumed_bg_catalog_hash": "5cf6755ace725cda",
    "consumed_shot_binding_hash": "781ec7f3cb94554f"
  },
  "step_id": "floor_plan_prompt",
  "run_id": "d9538d09-fc6a-4320-9d92-fe49db5400a7",
  "resolved_model": "gpt",
  "updated_at": "2026-09-04T17:26:21.736778+00:00",
  "project_config_snapshot": {}
}